Vantage VA2 is an 18 acre data center campus, that will house 3 data centers with a total critical power capacity of 96 MW. The buildings will be multi-story facilities and provide a combined capacity of 800,000 square feet.
Power
- Power provided by Dominion Energy, the leading energy provider in the region
- Multiple, diverse power feeds supporting the campus
- 480V end-to-end electrical distribution
Cooling
- Computer Room Air Handling (CRAH) units located in two galleries on opposite sides of each data module allow for highly efficient airflow distribution
- Closed-loop chilled water system with air-side economizers
- N+2 redundancy across all mechanical systems
- Water Utilization Efficiency (WUE) is near zero (liters/kW/hr) using the latest cooling design
Connectivity
- All major fiber-based service providers operating within two miles of the campus
- Six Meet-Me-Rooms (MMRs) throughout the campus, allowing for diverse paths and multiple connectivity options
- Three points-of-entry (POEs) for the campus ensuring maximum path diversity for inbound carriers
- Diverse fiber pathways into the campus (minimum two paths per carrier)
Security
- On-site security operations center with patrols 24x7x365
- Perimeter security gates and fencing
- CCTV on all access control points throughout the entire campus
- Dual authentication (access badge/PIN and biometric readers) for customer and critical infrastructure areas
- Visitor management system and badging to control and track onsite personnel all the time
It is located less than two miles from the Vantage VA1 campus.
This is a campus listing, that covers multiple data centers. Click below listings for further details:
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in
Vantage VA2 - Ashburn II Campus, other data centers in Sterling or operated by Vantage Data Centers, please try our
free quote service or reach out for a
free consultation about your data center needs.
Advertisement