CyrusOne NVA3, part of the NVA1-3 Campus in Sterling. A 14 Acre campus that is home to their NVA1, NVA2 and NVA3 data centers, providing a total of 420,000 square feet of data center space and 48 MW critical power.
Power
- Up to 48 MW of total capacity
- 48 MW of critical power at N and 36 MW at distributed redundant
- Multiple levels of redundancy available within the same footprint (i.e. N, Distributed Redundant, 2N, or a combination)
- Dual-Input PDUs with Static Transfer Switches (STS’s)
- 85.5MW dedicated diesel generators
- 6,800-gallon belly tanks for each generator (supports critical load for 48-hours) with diverse refueling agreements.
Cooling
- 36-inch raised floor design
- Utilizing Stulz 200-ton CRAH units with electronically commutated (EC) variable-speed fans
- Highly-efficient 500-ton Trane chillers with rapid restart and adaptive controlled microprocessors
- Ability to scale as density increases in an N+1 central plant design and an N+2 air-side design.
Connectivity
- Carrier-neutral and part of the CyrusOne Internet Exchange (IX)
Fire Detection and Suppression
- Very Early Smoke Detection Apparatus (VESDA) system; sampling air in parts per million coupled with a zonal dual-action interlocking dry-pipe pre-action system
Security
- 24/7 year-round onsite data center security guards
- Video surveillance and recording of exteriors and interiors
- Biometric and key card security for strict access control
- Turn style and other secure doors to prevent tail gating
- Reinforced physical infrastructure that can include concrete bollards, steel-lined walls, and bullet resistant glass
- Dedicated data halls, suites and cages to minimize traffic
Certification/ Audit Compliance Accreditations
Through disciplined assessment and audit processes, CyrusOne has implemented comprehensive practices for:
- ISO/IEC 27001 • PCI DSS
- HIPAA/HITECH • FISMA-High
- HITRUST • FFIEC
- CSA STAR • TRUSTe
- SSAE 18 (SOC 1 Type II), Type 2 AT 101/SOC 2
- Business Continuity and Disaster Recovery (BCDR)
CyrusOne is not FEDRAMP certified, through implementation of these processes, CyrusOne customers have been successful in obtaining their FEDRAMP certification. In addition, CyrusOne is designed to meet TIA 942 Class 4 requirements for electrical and mechanical.
Location/Amenities
- This location is in an area considered one of the safest in the country: free from natural disasters including seismic activity, tornados and hurricanes
- State-of-the-art offices, fitness center, staging room and hoteling space
, other data centers in Sterling or operated by CyrusOne Data Centers, please try our