CyrusOne NVA2 - Sterling

CyrusOne Data Centers
21111 Ridgetop Circle
20166 Sterling
Virginia, USA
Visit Website
CyrusOne Data Centers Logo

Suites
Cages
Private Cabinets


CyrusOne NVA2, part of the NVA1-3 Campus in Sterling. A 14 Acre campus that is home to their NVA1, NVA2 and NVA3 data centers, providing a total of 420,000 square feet of data center space and 48 MW critical power.

Power
- Up to 48 MW of total capacity
- 48 MW of critical power at N and 36 MW at distributed redundant
- Multiple levels of redundancy available within the same footprint (i.e. N, Distributed Redundant, 2N, or a combination)
- Dual-Input PDUs with Static Transfer Switches (STS’s)
- 85.5MW dedicated diesel generators
- 6,800-gallon belly tanks for each generator (supports critical load for 48-hours) with diverse refueling agreements.

Cooling
- 36-inch raised floor design
- Utilizing Stulz 200-ton CRAH units with electronically commutated (EC) variable-speed fans
- Highly-efficient 500-ton Trane chillers with rapid restart and adaptive controlled microprocessors
- Ability to scale as density increases in an N+1 central plant design and an N+2 air-side design.

Connectivity
- Carrier-neutral and part of the CyrusOne Internet Exchange (IX)

Fire Detection and Suppression
- Very Early Smoke Detection Apparatus (VESDA) system; sampling air in parts per million coupled with a zonal dual-action interlocking dry-pipe pre-action system

Security
- 24/7 year-round onsite data center security guards
- Video surveillance and recording of exteriors and interiors
- Biometric and key card security for strict access control
- Turn style and other secure doors to prevent tail gating
- Reinforced physical infrastructure that can include concrete bollards, steel-lined walls, and bullet resistant glass
- Dedicated data halls, suites and cages to minimize traffic

Certification/ Audit Compliance Accreditations
Through disciplined assessment and audit processes, CyrusOne has implemented comprehensive practices for:
- ISO/IEC 27001 • PCI DSS
- HIPAA/HITECH • FISMA-High
- HITRUST • FFIEC
- CSA STAR • TRUSTe
- SSAE 18 (SOC 1 Type II), Type 2 AT 101/SOC 2
- Business Continuity and Disaster Recovery (BCDR)
CyrusOne is not FEDRAMP certified, through implementation of these processes, CyrusOne customers have been successful in obtaining their FEDRAMP certification. In addition, CyrusOne is designed to meet TIA 942 Class 4 requirements for electrical and mechanical.

Location/Amenities
- This location is in an area considered one of the safest in the country: free from natural disasters including seismic activity, tornados and hurricanes
- State-of-the-art offices, fitness center, staging room and hoteling space


Part of CyrusOne Virginia Campus

This profile is a sublisting to the campus listing CyrusOne Virginia Campus.
- Click here to view the profile for CyrusOne Virginia Campus

Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in CyrusOne NVA2 - Sterling, other data centers in Sterling or operated by CyrusOne Data Centers, please try our free quote service or reach out for a free consultation about your data center needs.
Advertisement
Nearest Data Centers
The below data centers are located closest to 21111 Ridgetop Circle.
DistanceData CenterAddress
0.05 milesCyrusOne NVA1 - Sterling21111 Ridgetop Cir
0.08 milesCyrusOne Virginia Campus21111 Ridgetop Circle
0.09 milesCyrusOne NVA3 - Sterling21111 Ridgetop Circle
0.16 milesCentersquare - Sterling IAD1-C21110 Ridgetop Circle
0.17 milesCentersquare - Sterling IAD1-B45845 Nokes Blvd
0.23 milesCentersquare - Sterling IAD1-A45901 Nokes Blvd.
0.28 milesMaries Tech Park45761-45781 Maries Rd, Maries Tech Park
0.29 milesCOPT MP-345781 Maries Rd, Maries Tech Park
0.32 milesCOPT MP-145761 Maries Rd, Maries Tech Park
0.36 milesCOPT MP-245771 Maries Rd, Maries Tech Park
CyrusOne Data Centers

CyrusOne Data Centers

Data Center Operator at
CyrusOne NVA2 - Sterling
21111 Ridgetop Circle
Site Code: NVA2
Headquartered in Carrollton, Texas

82