The CloudHQ QLP Campus is located in Culpeper in Northern Virginia, with a 95 acre plot.
It is located right next to the Equinix Culpeper Campus (Equinix CU1-CU4), previously known as NAP of the Capital Region (as part of Terremark / Verizon).
The campus will feature three data centers, with a total critical power capacity of 142 MW. They will be powered by an on-site substation.
Data centers on campus:
- CLP1: 50 MW critical power + 303,750 square feet / 28,219 square meters
- CLP2: 50 MW critical power + 303,750 square feet / 28,219 square meters
- CLP3: 42 MW critical power + 346,690 square feet / 32,208 square meters
The 95 acre plot is located along McDevitt Drive and Technology Drive + Frank Turnage Drive.
This is a campus listing, that covers multiple data centers. Click below listings for further details:
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in
CloudHQ CLP Campus, other data centers in Culpeper or operated by CloudHQ, please try our
free quote service or reach out for a
free consultation about your data center needs.
Advertisement