Crusoe Energy Systems LLC is set to establish a cutting-edge 200MW AI data center at the Lancium Clean Campus near Abilene, Texas. This facility represents the first phase in a larger plan to expand AI workloads across a 1.2 GW power capacity. The data center is designed to be a beacon of modern AI infrastructure, with high-density data halls optimized for direct-to-chip liquid cooling or rear-door heat exchangers, and the flexibility to incorporate air cooling.
The center will be powered by a multibillion-dollar investment and aims to operate up to 100,000 GPUs on a single integrated network fabric. This design is not only a leap forward in data center architecture but also in the scale of AI training and inference workloads it can support. Crusoe's collaboration with Lancium underscores a shared commitment to decarbonizing compute for energy-intensive workloads, leveraging local renewable energy sources to minimize environmental impact.
Expected to be energized by 2025, the data center is a testament to Crusoe's mission to align the future of computing with the future of the climate. By reducing both the costs and environmental footprint of digital expansion, Crusoe is paving the way for sustainable growth in the AI sector.
If you are looking for colocation, cloud, connectivity or other services in Crusoe Abilene - Building 1, other data centers in Abilene or operated by Crusoe Energy Systems LLC, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Nearest Data Centers
The below data centers are located closest to Lancium Clean Campus, 5502 Spinks Rd.