On-Net Products - IP Transit - Ethernet Transport Services
Rack Configuration - 42U APC Cabinets (Model: AR3100). - Power extra (110v/20amp or 2x 110v/20amp is standard)
Carrier Availability - AT&T, Level3, City of Pasadena
Facilities - 6,800 square feet of raised floor colocation space in DC1 - 10,000 square feet of raised floor colocation space in DC2 - Custom cages available - 480v 3-phase utility feed - 4,000 amps
Security - C*CURE Card-Reader Access Control System; (16) total at all essential access points. - Entrance into actual data center requires HID card swipe and unique pin code for access - (25) cameras with remote monitoring and recording capabilities - recording to local DVR system; (2) IP cameras in use and tied into separate software
HVAC - Chilled-water system (3) Trane chillers 320-ton each. - Chillers work in "redundant" setup auto-tested weekly. - (3) Cooling Tourse - (6) 40-ton chilled-water Liebert HVAC units in DC1 - (4) chilled-water Air Handling Units in DC2 - 40,000-gallon underground water tank
UPS Systems - (6) 500kVA UPS Units (Model: Powerware) "A+B" systems of 3 parallel units each.
Generator Systems - (3) Caterpillar Diesel Generators, 1500kW each - Work in "parallel" for redundancy - 6,000 gallon diesel tank - (4) ATS units (Mfg: Benjamin Electric)
Electrical/Fire/Monitoring - (16) PDI PDUs & (4) Liebert PDUs in both DCs - Fire suppression & detection system consists of heat detectors, smoke heads , preaction sprinkler system, and separate gas-tank systems in each DC. - (4) FM-200 tanks in DC1 (112) Inergen tanks in DC2 - Vesda air sampling smoke detection system
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Cogent Data Center - Pasadena, other data centers in Los Angeles or operated by Cogent Communications, Inc., please try our free quote service or reach out for a free consultation about your data center needs.
Advertisement
Nearest Data Centers
The below data centers are located closest to 2947 Bradley Street.