
CyrusOne Data Centers
Data Center Operator at
CyrusOne LON3 - Slough
700 Stirling Road
Site Code: LON3
Headquartered in Carrollton, Texas
CyrusOne LON3 - Slough
700 Stirling Road
Site Code: LON3
Headquartered in Carrollton, Texas
Fully Built-Out Power | 9 MW |
Fully Built-Out Whitespace | 3,600 sq.m. |
Full Cabinets | |
Partial Cabinets | |
Shared Rackspace | |
Cages | |
Suites | |
Footprints | |
Remote Hands |
UPS Description: Distributed redundant UPS topology with 10-minute battery | |
Cooling Description: N+1 Indirect Adiabatic Air Cooled solution as standard | |
Standby Power Description: Fully rated distributed redundant LV back-up generators with 48-hour fuel |
Tier Design | Tier 3 |
DSS PCI Certified | |
ISO27001 Certified | |
ISO9001 Certified | |
ISO14001 Certified |
Fenced Perimeter | |
Mantrap Entry | |
CCTV surveillance | |
Biometric Access Control | |
Card Access Control | |
Automatic Firesupression | |
Firesupression System: VESDA (Very Early Smoke Detection Apparatus) |
Floor to Ceiling Height | 340 cm |
Meet-Me-Room (MMR) | |
Loading Bay |
Peering networks | 1 |
LON3 Spec Sheet |