
ANS Group Ltd.
Data Center Operator at
ANS (UKFast) MaNOC 5, 6 & 7
8 Blackmore Road
Headquartered in Manchester, United Kingdom
ANS (UKFast) MaNOC 5, 6 & 7
8 Blackmore Road
Headquartered in Manchester, United Kingdom
Fully Built-Out Power | 3.5 MW |
Fully Built-Out Whitespace | 22,000 sq.m. |
Total Building Size | 22,000 sq.m. |
Full Cabinets | |
Partial Cabinets | |
Shared Rackspace | |
Cages | |
Suites | |
Build-to-Suit | |
Footprints | |
Remote Hands |
PUE | 1.3 |
UPS Redundancy | N+1 |
UPS Description: N+1 Riello UPS | |
Cooling Redundancy | N+1 |
Cooling Description: N+1 DX CRAC systems, cold aisle containment | |
Standby Power Redundancy | N+1 |
Standby Power Description: N+1 diesel generators |
Tier Design | Tier 2 |
DSS PCI Certified | |
ISO27001 Certified | |
ISO9001 Certified | |
ISO14001 Certified | |
ISO22301 Certified | |
ISO27017 Certified | |
SOC 2 Type II Certified |
Fenced Perimeter | |
Mantrap Entry | |
CCTV surveillance | |
Biometric Access Control | |
Card Access Control | |
Automatic Firesupression | |
Firesupression System: Highly sensitive VESDA fire detection and gas suppression systems are installed in all of our datacentres | |
Onsite Security Staff | Yes, 24/7 |
Onsite Technical Staff | Yes, 24/7 |
Year Operational | 2013 |
Tenancy Type: Sole-tenant | |
Construction Type | Purpose-built |
Whitespace expandable | |
Roof Access | |
Building Floors | 2 |
Floor Type | Raised Floor |
Meet-Me-Room (MMR) | |
Conference Room | |
Breakroom | |
Office Space | |
Loading Bay | |
Crash Cart(s) | |
Loaner Tools | |
WiFi | |
Parking Available: Yes, with EV charging available |
Peering networks | 3 |
Network providers | 19 |