The BE Company
Data Center Operator at
County Gates
300 Poole Road
Headquartered in London, United Kingdom
County Gates
300 Poole Road
Headquartered in London, United Kingdom
Fully Built-Out Power | 3 MW |
Live Power | 1 MW |
Planned Power | 2 MW |
Fully Built-Out Whitespace | 1,394 sq.m. |
Full Cabinets | |
Partial Cabinets | |
Shared Rackspace | |
Cages | |
Suites | |
Build-to-Suit | |
Footprints | |
Remote Hands |
PUE | 1.5 |
UPS Redundancy | N+1 |
UPS Description: 2N for critical systems available. 5 x 160kVA Eaton UPS* (20-minutes at full load). Able to still support IT Load if loss of 2 units. | |
Cooling Redundancy | N+1 |
Cooling Description: N+1 on chillers N+1 on CRAC units | |
Standby Power Description: 2 x F G Wilson Generators* (48hrs at full load) *Connected in parallel. Each load tested to 960kW. |
Tier Design | Tier 3 |
DSS PCI Certified | |
ISO27001 Certified |
Mantrap Entry | |
CCTV surveillance | |
Biometric Access Control | |
Card Access Control | |
Automatic Firesupression | |
Firesupression System: Fire Alarm System with smoke detection. 2-Stage FM200 Fire Suppression Control. Vesda Air Sampling Systems | |
Onsite Security Staff | Yes, Biz-hours |
Onsite Technical Staff | Yes, Biz-hours |
Year Operational | 2009 |
Tenancy Type: Multi-tenant (mixed use) | |
Construction Type | Retrofitted |
Whitespace expandable | |
Floor Type | Raised Floor |
Meet-Me-Room (MMR) | |
Conference Room | |
Breakroom | |
Office Space | |
WiFi | |
Parking Available: Secure onsite parking |
Network providers | 3 |
County Gates Data Centre - Specifications |