Global Switch
Data Center Operator at
Global Switch Amsterdam West
Johan Huizingalaan 759
Headquartered in London, United Kingdom
Global Switch Amsterdam West
Johan Huizingalaan 759
Headquartered in London, United Kingdom
Fully Built-Out Power | 32 MW |
Total Building Size | 41,061 sq.m. |
Full Cabinets | |
Partial Cabinets | |
Shared Rackspace | |
Cages | |
Suites | |
Build-to-Suit | |
Footprints | |
Remote Hands |
Max power/area | 1.5 kW/sq.m. |
UPS Redundancy | 2N |
Cooling Redundancy | N+1 |
Standby Power Redundancy | N+1 |
Tier Design | Tier 3 |
DSS PCI Compliant | |
ISO27001 Certified | |
ISAE3402 Type 1 Certified | |
ISO9001 Certified | |
ISO14001 Certified | |
ISO45001 Certified | |
ISO50001 Certified |
Mantrap Entry | |
CCTV surveillance | |
Biometric Access Control | |
Card Access Control | |
Onsite Security Staff | Yes, 24/7 |
Onsite Technical Staff | Yes, 24/7 |
Construction Type | Purpose-built |
Roof Access | |
Floor Type | Raised Floor |
Meet-Me-Room (MMR) | |
Office Space | |
Loading Bay |
Internet Exchange Points | 4 |
Peering networks | 94 |
Network providers | 8 |
Tenants offering colocation | 10 |
Global Switch Amsterdam West Technical Specifications |