EXA DC Madrid
On April 04, 2024 nLighten acquired seven datacenters from EXA Infrastructure, including this one.
Distance | Data Center | Address |
---|---|---|
2.07 km | AtlasEdge MAD001 | Avenida de Manoteras 42B |
2.62 km | Equinix MD1 | c/Isabel Colbrand, 6-8 |
2.92 km | Masmovil Madrid | María Tubau, 8 |
3.68 km | Espanix Datacenter | Gran Via de Hortaleza 3 |
4.58 km | acens | San Rafael, 14 |
5.31 km | Prime Madrid | Calle de la Pedriza 1 |
5.47 km | Equinix MD6 | Calle de la Pedriza 12 |
5.47 km | Equinix MD3x | Calle de la Pedriza 12 |
5.57 km | CyrusOne MAD1 - Alcobendas | C. de El Nevero |
6.08 km | DATA4 Madrid - MAD1 | Avenida de la Industia, 15 |