Suites
Cages
Private Cabinets
The Edged Bilbao-Arasur Campus is a cutting-edge data center nestled in the industrial heartland of Arasur, renowned for its commitment to sustainability and innovation. With a robust capacity of 100 MW, the campus is comprised of three data center buildings and one administrative building, all designed with efficiency and future growth in mind.
Energy efficiency is at the forefront of the campus design, boasting a guaranteed Power Usage Effectiveness (PUE) of 1.15, which sets a new standard in the industry. The strategic location offers ultra-low latency connections to North America and Northern Europe, thanks to its position at a major fiber crossroads, enhancing global connectivity.
The commitment to environmental stewardship is evident in the adjacent 135 MW solar farm, highlighting Edged's dedication to clean energy and carbon-neutral operations. The innovative cooling systems support up to 70 kW per rack with air cooling and up to 200 kW with liquid cooling, all achieved without water usage, reflecting a responsible approach to local resource conservation.
The campus is equipped with state-of-the-art monitoring systems and secure Data Center Infrastructure Management (DCIM) controls, ensuring unparalleled reliability and an estimated "six nines" of availability. This makes the Bilbao-Arasur Campus not just a data center, but a visionary hub for data management and a driving force for sustainable progress.
This is a campus listing, that covers multiple data centers. Click below listings for further details:
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in
Edged Bilbao-Arasur Campus, other data centers in Bilbao or operated by Edged Energy, please try our
free quote service or reach out for a
free consultation about your data center needs.
Advertisement