The data center has a total IT load capacity of 12MW, powered by dual onsite substations and optional N+1 diesel generators with fuel contracts for refilling. It provides electrical distribution from N to full 2N redundancy and centralized UPS systems if required from N to 2N redundancy.
DCM101 employs energy-efficient cooling solutions, including chilled water with the option for warm water, fan wall design for mixed and high-density environments, direct liquid cooling, and heat offtake for heat reuse, aiming for a design PUE of less than 1.2.
It offers carrier-neutral connectivity with direct connections to international subsea fiber systems and dark fiber options.
Security measures include a 3-meter high security fence with thermal imaging cameras, multi-layer access control, vehicle traps, man traps, biometric readers, and full CCTV coverage.
, other data centers in Kristiansand or operated by Bulk Infrastructure , please try our
about your data center needs.
.