Reniewed in 2012. A new efficient and environmentally friendly cooling system is set up. Useful space - 135 square meters, maximum load - 120 kW. Cooling system - liquid free cooling, TIER II compliance (cooling system complies with TIER IV standard), power usage efficiency - 1.4.
Data Center 2
Build in 2010. One of the greenest data centers in Eastern and Central Europe, which uses outside air instead of the conventional cooling systems, based on the ground-breaking KyotoCooling system. Useful space - 180 square meters, maximum load 700 kW. Cooling system - air cooling (KyottoCooling). TIER II compliance. Power usage efficiency - 1.2.
Data Center 3
Useful space - 135 square meters, maximu load - 360 kW, TIER II compliance. Cooling system - liquid free cooling (Rittal Liquid Cooling).
Data Center 4
Useful space - 90 square meters, maximu load - 80 kW. Cooling system - air cooling, TIER II compliance. Power usage efficiency - 1.8. Protected against electomagnetic pulse.
Data Center 5
Useful space - 110 square meters, maximum load 110 kW, cooling system - air cooling. TIER II compliance. Power usage efficiency - 1.8.
Data Center 6
Useful space - 110 square meters, maximum load 110 kW, cooling system - air cooling. TIER II compliance. Power usage efficiency - 1.8. A building-in-building structure, with a perimeter separating the walls of the server room from the exterior walls of the building.
All data centers connected to optical metro ring Isolated server rooms Redundant power supply Redundant climate control Physical security and access control 24x7 Automatic fire extinguishing Operations and support 24x7
Services: - Colocation and hosting - Network management - Systems management - Systems monitoring - Infrastructure as a Service ISO/IEC 27001 compliance
Events
This data center has timeline events listed. Typically events are related to M&A history, rebranding, capacity expansions etc.
2017 - M&A - Baltic Data Center
Company name: UAB Baltic Data Center
Baltic Data Center was acquired by Telia Latvia in 2017
2022 - M&A - Telia Latvia (Zirmunu)
Company name: SIA Telia Latvija
SIA Tet acquired SIA Telia Latvija from Telia Company on June 21, 2022
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in Tet Zirmunu, other data centers in Vilnius or operated by Tet, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement
Nearest Data Centers
The below data centers are located closest to Zirmunu str. 141.