Data Center Map

EngineNode Meath Campus

EngineNode
The Hub Logistic Park, Bracetown Link Rd
15 Gunnocks
Ireland
Visit Website

EngineNode's planned data center campus in Bracetown and Gunnocks, County Meath, Ireland, spans 24.5 hectares. It will feature four two-story data centers with a combined gross floor area of approximately 92,100 sqm. The campus is strategically located near Meta's Clonee Campus, enhancing connectivity and accessibility.

The facility is designed with advanced infrastructure, including redundant power systems and efficient cooling mechanisms. It will also include a substation to ensure reliable energy supply. The campus aims to support hyperscale workloads and modern digital demands.

EngineNode has faced challenges during its development, including opposition from local organizations. Despite these hurdles, the company has successfully advanced its projects, demonstrating resilience and dedication to its vision of delivering high-quality data center solutions.


This is a campus listing, that covers multiple data centers. Click below listings for further details:
Data CenterOperated ByDetails
EngineNode Meath DC1EngineNode
EngineNode Meath DC3EngineNode
EngineNode Meath DC4EngineNode
EngineNode Meath DC2EngineNode
Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in EngineNode Meath Campus, other data centers in Dublin or operated by EngineNode, please try our free quote service or reach out for a free consultation about your data center needs. We use a best effort process to qualify opportunities and route them to matching operators.
Advertisement

EngineNode

Data Center Operator at
EngineNode Meath Campus
The Hub Logistic Park, Bracetown Link Rd
Headquartered in Dublin, Ireland

4