First Colo GmbH
Data Center Operator at
Firstcolo Data Center AOC
Hanauer Landstrasse 291b
Headquartered in Munich, Germany
Firstcolo Data Center AOC
Hanauer Landstrasse 291b
Headquartered in Munich, Germany
Fully Built-Out Whitespace | 1800 sq.m. |
Full Cabinets | |
Partial Cabinets | |
Shared Rackspace | |
Cages | |
Suites | |
Build-to-Suit | |
Footprints | |
Remote Hands |
PUE | 1.25 |
UPS Redundancy | N+1 |
UPS Description: Two UPS systems in N+1 network | |
Cooling Redundancy | N+1 |
Cooling Description: Air supply via the raised floor, warm air extraction in the ceiling area | |
Standby Power Description: Two standby power systems for the entire building |
Tier Design | Tier 3 |
ISO27001 Certified | |
ISO9001 Certified |
CCTV surveillance | |
Biometric Access Control | |
Automatic Firesupression | |
Firesupression System: FM200 and Novec1230 extinguishing system with low pressures | |
Onsite Security Staff | Yes, 24/7 |
Onsite Technical Staff | Yes, 24/7 |
Floor Type | Raised Floor |
Floor to Ceiling Height | 300 cm |
No data supplied by First Colo GmbH |
Peering networks | 11 |