Data Center Map

True North Exchange

Valley Fiber
965 HWY 14
R6W0L7 Winkler
Manitoba, Canada
Visit Website

Suites
Cages
Footprints
Private Cabinets
Partial Cabinets
Individual Servers
Bare Metal Servers
Public Cloud Servers


Total Power Data center capacity capacities:
- Tier 2 Equivalent IT load = 225 KW
- Tier 3 Equivalent IT load = 115 KW

Fully Modular N + 1 DC and AC power availability for T2
Fully modular N + N AC an DC power availability for T3

Backup Power:
- 300KW N+N generator backup
- Over 72 hours of on reserve fuel
- 4 hour refuel response

Power availability:
- 120 Volt Single phase
- 208 Volt Single phase
- 208 Volt 3 Phase
- 48 Volt DC

- Rack Space / Power Density
45 RU Full Cabinets available with up to 10KW power density.
22 RU ½ Cabinets available with up to 5KW power density.

Total Colo Space: approx. 3300 square feet with approx. 2300 square feet available.

The True North exchange features an industry leading Commscope NG4 cross connect system which allows any tenant to gain direct access to Valley Fibers Dedicated fiber build.


Pricing & Services
If you are looking for colocation, cloud, connectivity or other services in True North Exchange, other data centers in Winkler or operated by Valley Fiber, please try our free quote service or reach out for a free consultation about your data center needs.
Advertisement

Valley Fiber

Data Center Operator at
True North Exchange
965 HWY 14
Headquartered in Winkler, Manitoba

1