
Equinix
Data Center Operator at
Equinix NY3
600 Jefferson Ave
Site Code: NY3
Headquartered in Redwood City, California
Equinix NY3
600 Jefferson Ave
Site Code: NY3
Headquartered in Redwood City, California
| Fully Built-Out Power | 50 MW |
| Fully Built-Out Whitespace | 48860 sq.f. |
| Total Building Size | 250853 sq.f. |
| Full Cabinets | |
| Partial Cabinets | |
| Shared Rackspace | |
| Cages | |
| Suites | |
| Build-to-Suit | |
| Footprints | |
| Remote Hands |
| UPS Redundancy | N+1 |
| Cooling Redundancy | N+1 |
| Standby Power Redundancy | N+1 |
| No data supplied by Equinix |
| Mantrap Entry | |
| CCTV surveillance | |
| Biometric Access Control | |
| Card Access Control | |
| Automatic Firesupression | |
| Firesupression System: Double Interlock Pre-action System (dry pipe) | |
| Onsite Security Staff | Yes, 24/7 |
| Tenancy Type: Sole-tenant | |
| Construction Type | Purpose-built |
| Conference Room | |
| Breakroom | |
| Crash Cart(s) | |
| Loaner Tools | |
| WiFi |
| No data supplied by Equinix |
No files available |