Data Center Map

SHOOK Data Center Construction



Visit Website

We build Data Centers.
Our prices are very competitive, and our services are excellent.
We have built more than $1,000,000,000 of data centers, including data centers for supercomputer centers, applied physics research facilities, national weather centers, bank regulatory and mint centers, bank headquarters, airlines, and more.

Here is an example of our pricing:
Data Center example of construction costs (T3, T4)
The data center computer room floor area of 20,000 square feet
(1858 square meters), T4 level, Dual 5.0 MW UPS high density room.
We are qualified to build any size and level data center in most countries.
Project estimated price for your reference. Total price will vary depending on circumstances
and current market pricing of materials and conditions of site and other unknown factors.

The following is a preliminary quote for your reference.
We can provide a detailed breakdown of costs when you need it:

T3 level Data Center:
(total construction area of 6,000 square meters with raised floor. 20,000 square feet with raised floor = 6,000 square meters)
= $51,742,000

T4 level Data Center:
(total construction area of 6,000 square meters with raised floor. 20,000 square feet with raised floor = 6,000 square meters)
= $56,920,000

1. Above estimate is based on the elevated floor area / ancillary area = 1/2.5 calculated on the basis that the data center floor area overhead 1858 square meters, total construction area of 6,500 square meters.
2. Above all designed according to the U.S. TIA-942 standards and were designed to meet all U.S. Requirements.

Contact us to discuss your projects, and our cooperation.

Visit Website

SHOOK Data Center Construction

Headquartered in Beijing, Beijing